SE Grand Rapids, MI

Bathroom Remodel

Home built in 1915. Bathroom remodel was performed with the goal of staying true to the artistic aesthetic of a home built in the early 20th century. The clawfoot tub was taken off site to be reglazed to a stunning finish. We tiled the tub area and the bathroom floor to accommodate an exposed shower system. The homeowner was also involved with some tasks to save on overall project cost.